You can browse all the published concept maps without signing in. If you'd like to create your own concept maps, all you have to do is sign in with Twitter. It's free!
The cost of replacing the service potential of an existing asset, by reference to some measure of capacity, with an appropriate modern equivalent asset.
IIMM
The cost of restoring an existing asset’s gross service potential on deprival, whether by reproduction of the existing asset or replacement with a reference asset.
DERM