A physical component of a facility which has value,enables services to be provided and has an economic life of greater than 12 months. Dynamic assets have some moving parts, while passive assets have none. IIMM
An asset is an object (physical or intangible) that has an identifiable value and a useful life greater than 12 months, that is or could be used by the entity responsible for it to provide a service. LGAM
Asset - An item with an independent physical and functional identity and age, within a facility (e.g. pump, motor, sedimentation tank, main). Asset - Service potential or future economic benefits controlled by entity as a result of past transactions or other past events. DERM
Asset condition is a measure of the health of an asset. LGAM
Describes the rate at which an asset's condition degrades over time.
The defined service quality for a particular activity (i.e. roading) or service area (i.e. streetlighting) against which service performance may be measured. Service levels usually relate to quality, quantity, reliability, responsiveness, environmental acceptability and cost. IIMM
The defined service quality for a particular activity (i.e. roading) or service area (i.e. streetlighting) against which service performance may be measured. Service levels usually relate to quality, quantity, reliability, responsiveness, environmental acceptability and cost.
IIMM
"Level of Service" can be defined as the service quality for a given activity. Levels of Service are often documented as a commitment to carryout a given action or actions within a specified time frame in response to an event or asset condition data.
LGAM
The cycle of activities that an asset (or facility) goes through while it retains an identity as a particular asset i.e. from planning and design to decommissioning or disposal.
IIMM
Life cycle has two meanings: 1. The cycle of activities that an asset (or aggregation of assets) goes through while it retains an identity as that asset. These activities include planning, design, acquisition and support, including rehabilitation and disposal. 2. The period of time between a selected date and the cut-off year or last year, over which the criteria (e.g. costs) relating to a decision or alternative under study will be assessed.
DERM
An organisation such as a Local Council that is responsible for the management of infrastructure assets in a defined local area.
The cost of replacing an existing asset with a substantially identical new asset.
IIMM
The "Replacement Cost" (also Replacement Value & Capital Replacement Value) of an asset is the cost of replacing it with a substantially identical new asset.
LGAM
A risk is the probability of a failure of an asset as a result of the occurrence of a hazard. There may be a resulting cost associated with the risk.
A system supplying a public need such as transport, communications, or utilities such as electricity and water.
An organisation responsible for providing a service.
The defined service quality for a particular activity (i.e. roading) or service area (i.e. streetlighting) against which service performance may be measured. Service levels usually relate to quality, quantity, reliability, responsiveness, environmental acceptability and cost.
IIMM
The current value of a non-current asset of a local government is the loss that it would incur if it were deprived of the asset’s utility (or service potential). (Synonymous with ‘deprival value’.)